Construction engineers in hard hats standing on a concrete slab deck with post-tension cables laid out on the next pour bay
PT design review · optimisation · full packages  ·  UAE & GCC

Expert post-tension design in the UAE and the GCC

Four design services for post-tension work in the UAE and the GCC: PT design review, PT design optimisation, preliminary design support and full post-tension design packages, plus site supervision and stressing support.

Design codes
ACI 318 · Eurocode 2 · PTI
Analysis
RAM Concept
15+
Years in PT & RC
ACI+EC2
Design codes we work to
RAM
Concept PT analysis
6
GCC markets served
S-147 Site

Site supervision and stressing support.

The same engineer who designs and reviews checks the work on site.

  1. 01Review of shop drawings and stressing schedule
  2. 02Pre-pour inspection: profiles, anchorages, coordination
  3. 03Hold / release with photo report
  4. 04Concrete strength check before stressing
  5. 05Stressing witness and elongation comparison
  6. 06Record review and close-out note
Close-up of a steel reinforcement rebar mesh grid used in concrete slab construction
Site engineer in a hard hat inspecting a concrete slab deck while holding drawings
Close-up of yellow construction machinery with steel-protected hydraulic hoses and fittings
S-148 Which service

Which service do you need?

Choosing an Iron Axis service
Your situationService
A PT design exists and needs a thorough technical checkPT design review
The design looks heavy or costlyPT design optimisation
Concept, feasibility or tender stagePreliminary design support
You need the complete PT design for approval and constructionFull post-tension design package
Tendons are being laid or stressedSite supervision and stressing support
S-145 Credentials

Verified credentials, no padding.

We list only what can be checked. Project case studies are added with client permission.

  • 15+ years of GCC post-tension design and site experience across the team.
  • Dubai Municipality and UAE authority PT design and submission criteria.
  • RAM Concept: PT slabs are analysed and designed in RAM Concept, with the model handed over with the package.
  • Consultants and contractors: we work with consultants, main contractors, developers and PT specialist contractors on projects across the UAE and the GCC.

Comparing post tension companies in the UAE? See how our team works with consultants, main contractors and PT specialist contractors on PT design, review and site supervision.

About our team

S-149 Authorities

Authority approvals and PT criteria across the UAE.

Familiar with and well versed in each municipality's PT design and submission criteria.

Every emirate, and some master developers and free zones, has its own authority with its own way of receiving structural and post-tension submissions. The engineering principles do not change, but the code edition, the format of the calculation report, the drawing requirements and how comments are raised do. Our engineers have worked with these requirements over 15+ years in the UAE and the wider GCC, so a PT design or review from Iron Axis is prepared to the criteria of the authority that will check it.

AuthorityWhere it applies and what it means for PT
Dubai Municipality (DM)Most plots in Dubai. Structural design to the Dubai Building Code with DM structural and PT submission requirements; PT design by a DM-licensed post-tension design engineer.
Dubai Development Authority (DDA)Plots in DDA-regulated communities and free zones. DDA publishes its own structural and post-tension design review checklists for consultant submissions.
Trakhees (PCFC)Plots regulated by the Ports, Customs and Free Zone Corporation, such as Jebel Ali areas. Trakhees has its own building and structural submission procedures.
Abu Dhabi (DMT and municipalities)Abu Dhabi, Al Ain and Al Dhafra. Structural design under the Abu Dhabi International Building Code (ADIBC), which is based on the International Building Code, with ACI 318 for concrete.
Sharjah MunicipalitySharjah city and its regions, with the municipality's own structural drawing and calculation submission requirements.
Ajman MunicipalityAjman. Municipality building permit and structural submission requirements.
Ras Al Khaimah, Umm Al Quwain and FujairahEach municipality, and the relevant free zone authority where the plot falls in one, sets its own permit and structural submission requirements.

At kick-off we confirm which authority has jurisdiction over the plot, the governing code and edition, and the consultant's specification. The calculation report, tendon drawings and comment responses are then prepared in the format that authority expects. Submissions themselves are made through the consultant of record.

Need a PT design checked before submission? Our municipality PT design review support across all seven UAE emirates covers calculations, analysis models, tendon drawings and technical comment responses through your project consultant. Any requirement for an authority-approved third-party checker or stamp must be confirmed by the consultant and authority.

S-301 Post-tensioning

The drape is the design.

Get the tendon profile right and the slab gets thinner, the deflections disappear and the programme shortens. Get it wrong and no amount of rebar recovers it.

DRAPE 165 SPAN 8.0 m 250 LOW POINT AT 0.5L A — ELEVATION B — PLAN BANDED — OVER COLUMN LINES DISTRIBUTED A A
Fig. 3.1 — Banded / distributed layout. Continuous unbonded tendon, reverse curvature over supports.

Every post-tensioned slab we design is checked at transfer and in service, for flexure, punching, deflection and crack width, with the hyperstatic effects carried properly through to the reinforced concrete design. Nothing is left to a rule of thumb.

We work in both unbonded monostrand — the system that dominates Middle East practice — and bonded multistrand, and we produce the tendon layouts, chair profiles, stressing schedules and elongation records that the specialist contractor actually needs on site.

P/A
Precompression checked span by span
Δ
Long-term deflection with creep & shrinkage
wk
Crack width to the governing exposure class
S-302 Tips & tricks

Nine things that decide a PT slab.

The working rules we apply at scheme stage, before a single tendon is drawn. They set the starting point — the design is still whatever the calculation says.

A — Sizing

  1. 01

    Set the depth before the load

    Span/depth drives everything downstream. For interior spans of an unbonded flat slab, L/d ≈ 40–45 works with light superimposed load; come down to 36–38 where deflection-sensitive partitions, long cantilevers or heavy finishes govern. Fix the thickness first — prestress and rebar are the cheap variables.

    L/d 40–45
  2. 02

    Precompression is the real dial

    ACI 318-19 sets a minimum average effective prestress of 0.86 MPa on the gross section for two-way slabs. The useful working range is roughly 1.0–2.0 MPa. Push past about 2.5 MPa and you buy restraint cracking and axial shortening, not capacity.

    P/A 1.0–2.0 MPa
  3. 03

    Balance the sustained load, not the total

    Balancing much above 85% of dead load tends to hog the slab and leave long-term upward camber. Much below 55% and you have paid for a PT system that behaves like a conventional slab. Aim between the two and let the unbalanced load run the deflection check.

    60–80% of DL

B — Analysis

  1. 04

    Punching governs earlier than flexure

    Run the punching check on the first thickness iteration, not the last. The vertical component of the tendon force only helps where the tendons actually cross the critical section — and stud rails retro-fitted after the layout is frozen will force the tendons to move.

    Check at iteration 1
  2. 05

    Check transfer, not just service

    At stressing the concrete is young — f′ci is often only 22–28 MPa at three to five days — and there is almost no superimposed load holding the slab down. Top-fibre tension over supports at transfer catches more otherwise-sound designs than the service check does.

    f′ci at 3–5 days
  3. 06

    Model the restraint

    Stiff cores and shear walls absorb the prestress you assumed went into the slab. On long floor plates put pour strips in at roughly 40–50 m centres and leave them open long enough for the early shortening to happen. Assume a free slab and you will find the cracks on site.

    Pour strips 40–50 m

C — Detailing & site

  1. 07

    The drape you draw must be buildable

    Usable drape is what survives top and bottom cover, the sheathing and the bars crossing it — for a 250 mm slab that is around 165 mm, not 200. Check it against the chair heights the contractor can actually buy before it goes on the drawing.

    250 slab → 165 drape
  2. 08

    Two tendons through every column core

    The structural-integrity rules require at least two tendons in each direction to pass within the column core. It is the detail most often lost when a layout is shifted around a late opening — and it is the one that matters if a column is ever lost.

    2 tendons min., each way
  3. 09

    Issue the stressing schedule with the layout

    Theoretical elongation, gauge pressure, stressing sequence and the acceptance band — typically ±7% — belong on the drawing set, not in an email three weeks later. It is the difference between a clean QC record and a site query per tendon.

    Elongation ±7%

Figures quoted are scheme-stage rules of thumb for unbonded monostrand flat slabs to ACI 318-19, offered in good faith and not a substitute for project-specific design. Ask us and we will run the numbers on your grid.

S-501 Delivery

How a job runs.

A fixed sequence, so you always know which stage the design is at and what is needed from you next.

STAGE 01

Brief & constraints

Architectural set, GI report, loading, authority requirements and programme.

STAGE 02

Scheme & optimisation

Framing options, slab type and thickness, prestress level, comparative cost.

STAGE 03

Analysis & design

Full model, gravity and lateral, all code checks at transfer and service.

STAGE 04

Detailing & drawings

Tendon layouts, rebar, sections and schedules issued as a coordinated set.

STAGE 05

Authority submission

Calculation report, submission set, and structured replies to review comments.

STAGE 06

Site support

RFIs, method statement review, stressing records and as-built resolution.

S-151 Resources

Technical guides.

GUIDE

What is post-tensioning? A design engineer's guide

What is post-tensioning? How PT concrete works, bonded vs unbonded tendons, design checks, approvals and stressing in the UAE and GCC, from PT design engineers.

Read more →
GUIDE

Post-tensioned vs reinforced concrete slabs in the UAE

Post-tensioned vs reinforced concrete slabs for UAE buildings: thickness, spans, programme, cracking, openings and when PT pays back.

Read more →
GUIDE

Bonded vs unbonded post-tensioning: how to choose

Bonded vs unbonded post-tensioning explained: behaviour, durability, fire, alterations and demolition, and how to choose for GCC buildings.

Read more →
GUIDE

PT slab design checklist (ACI 318-19 and PTI)

A practical PT slab design checklist to ACI 318-19 and PTI guidance: loads, losses, stresses, strength, punching, deflection, detailing and drawings.

Read more →
GUIDE

PT stressing: elongation tolerances and records

How PT stressing elongations are calculated, the ±7% tolerance commonly used, what a stressing record should contain and what to do when a tendon is out.

Read more →
GUIDE

Openings and coring in post-tensioned slabs

How to add openings, cores and post-installed anchors in post-tensioned slabs: tendon location, scanning, design checks, strengthening and who approves.

Read more →
GUIDE

Prestress losses and elongation calculation

PT prestress losses explained: friction, wobble, anchor set, elastic shortening, creep, shrinkage and relaxation, and how elongation is calculated.

Read more →
GUIDE

PT flat slabs vs banded beam slabs

Post-tensioned flat slab vs banded beam floors: banded and distributed tendons, load balancing, punching shear, slab thickness and when each layout wins.

Read more →
GUIDE

Anchorage zones and bursting reinforcement in PT slabs

Post-tension anchorage zone design: bursting and spalling forces, anchorage reinforcement, edge distance and stressing pockets, to ACI 318 and PTI.

Read more →

All resources · Post-tension FAQ · About our team

S-201 FAQ

Questions we are asked about this.

What is a post-tensioned slab?

A post-tensioned concrete slab with high-strength steel tendons that are stressed after the concrete hardens. The tendons balance part of the load and put the slab into compression, allowing thinner slabs and longer spans.

What does Iron Axis do?

Four post-tension design services (PT design review, PT design optimisation, preliminary design support and full PT design packages) plus site supervision and stressing support, for projects in the UAE and GCC.

What does your scope cover on a PT project?

PT design review, PT design optimisation, preliminary design support, a full PT design package, and site supervision and stressing support. We work alongside the consultant of record and the PT specialist contractor appointed for the project, so our design and supervision stay focused on the engineering.

Who does the work?

Our engineering team, led by our Lead Engineer, with 15+ years of post-tension experience across the GCC, working to Dubai Municipality and UAE authority PT criteria, designing in RAM Concept.

Which countries do you work in?

The UAE, Saudi Arabia, Qatar, Oman, Bahrain and Kuwait. Site attendance is mainly in the UAE; other countries are supported remotely with planned visits.

Free calculators: RC vs PT slab comparison (thickness, quantities, cost, weight and height), PT slab thickness for flat plates, drop panels and band beams, PT long-term prestress losses to ACI or Eurocode 2, plus rebar weight, bar bending schedule (BBS), concrete volume, development length (ACI 318), lap length (Eurocode 2), punching shear (ACI 318 and Eurocode 2), PT bursting reinforcement, PT tendon elongation, beam deflection, structural unit converter, moment of inertia / section properties, steel weight, continuous beam, RC beam design, RC column capacity, isolated footing design, one-way slab design, load combinations, slab load, retaining wall design, stair calculator, block calculator, tile quantities, paint quantities and a construction cost per sq ft estimator for the UAE, India and KSA.

S-901 Contact

Send the drawings. Get an answer from our engineers.

WhatsApp or email the architectural or structural set, the location and what you need. The reply comes from the engineers who will do the work, with a proposed scope and programme.

Office
Al Warqa 1, Dubai, UAE
Hours
Sunday – Thursday, 09:00 – 18:00 GST