1. Home
  2. Tools
  3. Construction cost per sq ft
Free tool  ·  Indicative  ·  Iron Axis engineering team

Construction cost per sq ft: UAE, India and KSA

Estimate a construction cost from a published 2025 typology, or from a rate you type in. Figures for Dubai, Abu Dhabi, Riyadh and Mumbai come from Turner & Townsend’s Global Construction Market Intelligence 2025 and are shown as a range of building types, in both m² and sq ft. Every rate is editable. Villa and low-rise house rates are not in that survey — enter a local figure for those.

Engineering disclaimer. This free tool is for preliminary checks and education only. It uses simplified code methods and your inputs, and it is not a substitute for project design. Results must be verified by a qualified structural engineer responsible for the project. Verify every result against the current code edition, national annex, authority requirements and the project drawings before use. Iron Axis accepts no liability for decisions or designs based on these results. Read the full disclaimer.
1. Location and building type

Source: Turner & Townsend, UAE Market Intelligence 2025. Figures are for Q1 2025, excluding tax, and are editable.

2. Rate and area (the rate is always editable)
Prefills with the published typology. Edit it, or switch the market to “Enter my own rate”.
The floor area the rate applies to. GCMI costs are per m² of the building, not the plot.
—
Step-by-step working

Indicative only, not a design. The results follow the methods and clauses set out below and depend on your inputs. Check them against the project drawings, specifications and the product data sheets you will actually use.

How we calculate it

The estimated cost is the construction area, converted to square metres, multiplied by the rate per square metre. A rate entered per square foot is converted with 1 m² = 10.7639 ft². We do not add tax, fees, land or inflation beyond the published figure, and we do not invent a villa rate.

The default example is 200 m² of high-rise apartments in Dubai at the published AED 5,500 per m² (Turner & Townsend UAEMI 2025): 200 × 5,500 = AED 1,100,000, or about AED 511 per sq ft. That figure is for high-rise apartments, not a villa.

What the calculator does

People search “construction cost per sq ft in Dubai”, “villa construction cost”, “house construction cost India” and “construction cost per square meter in Saudi Arabia” every day. The honest way to answer that is with a named, dated source, a clear building type, and a rate you can edit. This estimator does that. It is not a quotation and it is not a bill of quantities.

Where the rates come from

All pre-filled rates are from Turner & Townsend’s Global Construction Market Intelligence 2025, as republished in the firm’s 2025 UAE and KSA market intelligence pages, and from the Asia chapter of the same report for Mumbai.[1][2][3][4] The typologies are Q1 2025 direct construction costs, excluding tax. They include preliminaries, the structure, finishes, fittings, plumbing, HVAC, fire protection, electrical and transport systems. They exclude land, professional fees, furniture, external works, demolition and abnormal ground.[4]

In Dubai the published typologies run from AED 4,000/m² for a large warehouse to AED 10,500/m² for a 5-star hotel; high-rise apartments sit at AED 5,500/m². Abu Dhabi uses the same apartment figure, with offices at AED 6,000/m². In the KSA table, typologies run from SAR 8,000/m² for a large warehouse to SAR 22,500/m² for a 5-star hotel; high-rise apartments sit at SAR 8,500/m², and Riyadh’s six-type average is reported as US$3,112/m². For India, the Asia chapter gives a Mumbai city average of US$723/m²; we have not found a typology breakdown for Delhi or Bengaluru in the same public pages, so those cities need a rate you enter.

What we will not invent

GCMI 2025 does not publish a villa or low-rise house package rate for the UAE, India or KSA. We therefore do not offer one. If you are costing a villa or a house, switch the market to “Enter my own rate” and type a figure from a priced tender or a quantity surveyor. For official Indian preliminary estimates, use a CPWD Plinth Area Rate for the building typology, adjusted by the city cost index (PAR 2025, with base 1 April 2025).[5] We do not reprint those official rupee schedules here, because we cannot verify every line against the current official PDF in this tool.

How to use it

  1. Choose Dubai, Abu Dhabi, Riyadh / KSA, Mumbai, or your own rate.
  2. Pick the published building type that is closest to your project, or accept that none of them is a villa and enter a local rate instead.
  3. Edit the rate if you have a more recent or more specific figure. The published number is only a starting point.
  4. Enter the construction or built-up area in m² or sq ft.
  5. If the currency is US dollars and you want to see rupees as well, type your own INR per USD. We do not supply an exchange rate.
  6. Read the total and the rate per sq ft, then print or download the estimate.

Assumptions and limitations

  • Rates are typologies or city averages, not a quote for your site, specification, height or programme.
  • The figures are Q1 2025. Construction-cost inflation in Dubai, Abu Dhabi and Riyadh was forecast at 5% for 2025 in the same report.[1][2] We do not automatically inflate them.
  • Area is the construction / built-up area the rate applies to, not the plot area.
  • A typed rate is used as entered. We do not verify it.

Related tools

Concrete and reinforcement often dominate an early quantity check. Use the concrete volume calculator (with a cement–sand–aggregate split) and the rebar weight calculator. To compare a post-tensioned floor with a reinforced concrete slab on cost as well as thickness, use the RC vs PT slab calculator. For work in the region, see our pages on post-tension design in the UAE and post-tension design in Saudi Arabia.

References

The codes and references the calculator follows, consulted on 17 November 2026. Always use the edition, data sheet or report you will actually rely on.

  1. Turner & Townsend: UAE Market Intelligence 2025, Construction cost performance: Dubai and Abu Dhabi asset-type average costs in AED/m² for 2025; Dubai US$1,926/m² and Abu Dhabi US$1,872/m² as six-type GCMI 2025 averages; 2025 inflation forecast 5%.
  2. Turner & Townsend: KSA Market Intelligence 2025, Construction cost performance: asset-type average costs in SAR for 2025; Riyadh six-type average US$3,112/m² (US$2,593 in 2024).
  3. Turner & Townsend: Global Construction Market Intelligence 2025, Asia chapter: “India enjoys significantly lower construction costs (for example, US$723 per m² in Mumbai)”.
  4. Turner & Townsend: Global Construction Market Intelligence 2025, Methodology: six building types; Q1 2025 programmes; exchange rates March 2025; inclusions (direct building costs with preliminaries and services) and exclusions (land, fees, tax, external works, furniture, abnormal ground).
  5. Central Public Works Department, Government of India: Plinth Area Rates 2025 (12th edition; base 1 April 2025 as 100), for official Indian preliminary and rough cost estimates. Enter the PAR and cost index yourself; we do not reprint the official rupee schedule in this tool.

Part of our free engineering tools and design guides. Figures and clauses are referred to where we are confident of the reference; always check the edition, data sheet or report adopted for your project.

S-631 FAQ

Questions we are asked about this.

What is the construction cost per sq ft in Dubai?

It depends on the building type. Turner & Townsend’s 2025 typologies, expressed per square foot, run from about AED 372/ft² for a large warehouse (AED 4,000/m²) to about AED 975/ft² for a 5-star hotel (AED 10,500/m²). High-rise apartments are listed at AED 5,500/m², which is about AED 511/ft². These are Q1 2025 typologies, not a villa rate and not a quotation.

How much does it cost to build a villa in Dubai or a house in India?

We do not publish a villa or house package rate, because Turner & Townsend GCMI 2025 does not include one, and we will not invent a number. Enter a local rate from a priced tender or a quantity surveyor. For official Indian preliminary estimates, apply a CPWD Plinth Area Rate and the city cost index (PAR 2025).

What is the construction cost per square metre in Riyadh?

Turner & Townsend report a six-type average of US$3,112/m² for Riyadh in GCMI 2025. The KSA typology table lists, among others, SAR 8,500/m² for high-rise apartments and SAR 9,000/m² for medium A-grade CBD offices, up to SAR 22,500/m² for a 5-star hotel. All of these are editable starting points, not a quotation.

Why is the India figure in US dollars?

That is how GCMI 2025 publishes the Mumbai average (US$723/m²). We show it as printed so we do not hide an exchange-rate assumption. If you want rupees, type your own INR per USD, or switch to “Enter my own rate” and type an INR figure from a tender or from CPWD Plinth Area Rates.

Can I print or save the estimate?

Yes. Use Print, Download PDF or Download CSV. The report records the market, the building type, the rate you used, the source and the working, so you can see whether a number is a published typology or a figure you typed.

S-901 Contact

Send the drawings. Get an answer from our engineers.

WhatsApp or email the architectural or structural set, the location and what you need. The reply comes from the engineers who will do the work, with a proposed scope and programme.

Office
Al Warqa 1, Dubai, UAE
Hours
Sunday – Thursday, 09:00 – 18:00 GST