Work out the concrete volume for slabs, footings, rectangular and circular columns, beams and staircase flights, add a waste allowance and see how many ready-mix truck loads it takes. Optionally split that order volume into cement bags, sand and aggregate by mix ratio. The working is shown step by step, with a printable report, a PDF and a CSV.

Engineering disclaimer. This free tool is for preliminary checks and education only. It uses simplified code methods and your inputs, and it is not a substitute for project design. Results must be verified by a qualified structural engineer responsible for the project. Verify every result against the current code edition, national annex, authority requirements and the project drawings before use. Iron Axis accepts no liability for decisions or designs based on these results. Read the full disclaimer.
Slab
Footings
Rectangular columns
Circular columns
Beams
Staircase flights
Waste, trucks and weight
Your own allowance for spillage, over-break and finishing.
Confirm the load size with your supplier.
24 plain, 25 reinforced (EN 1991-1-1 Table A.1).
Cement, sand and aggregate
Conventional allowance to estimate loose material from the wet (compacted) volume. Not a code value; 1.54 is widely used. Editable.
Default 1,440 kg/m³, so a 50 kg bag is 0.0347 m³ (28.8 bags per m³ of cement). Editable.

M25 and richer mixes are design mixes under IS 456:2000; enter your approved ratio rather than a nominal one. The ready-mix order is the volume to order above, in m³ (and yd³). This split is for site-batched concrete.

— m³ to order 4 trucks of 10 m³
Step-by-step working

Indicative only, not a design. The results follow the methods and clauses set out below and depend on your inputs. Check them against the project drawings, specifications and the code edition and national annex adopted for the project.

How we calculate

1. Volume of each element

  • Slab: V = L × W × t. Footing or pad: V = L × B × D. Rectangular column: V = b × h × H. Circular column: V = πD²/4 × H. Beam: V = b × d × L, with d the depth below the slab soffit so the slab is not counted twice.
  • Staircase flight: the steps are N triangles of ½ × r × g, and the waist slab is the inclined length N√(r² + g²) times the waist thickness t, both times the flight width w. Landings are entered as slabs.
  • Plan sizes are in metres and section sizes in millimetres; each is converted to metres before multiplying. Each element volume is multiplied by its quantity.

2. Order quantity and trucks

  • Volume to order = net volume × (1 + waste/100). Truck loads = the order volume divided by the truck size, rounded up, and the last load is what remains after the full loads.
  • Self-weight of the net volume = V × γ, with γ = 24 kN/m³ for plain normal weight concrete and 25 kN/m³ with a normal percentage of reinforcement [1]. Tonnes = kN/9.80665.
  • Ready-mixed concrete is ordered and measured by volume [2]; confirm the minimum and part-load rules with your supplier.
  • Print gives a one-document report with inputs, results, working, date and disclaimer. Download PDF builds the same report as a PDF in your browser; nothing is sent to us. Download CSV gives the numbers for a spreadsheet.

What the calculator does

A concrete quantity is usually the first number anyone asks for, whether it is for a cost check, a pour plan or a comparison between structural schemes. This calculator adds up the volume of the common building elements, applies the waste allowance you choose and tells you how many truck loads that means for the truck size you enter.

We use the same arithmetic when we compare structural options, for example a reinforced concrete flat slab against a post-tensioned one, where the concrete saved by a thinner slab is one of the main differences.

How to use it

  1. Tick each element type you need and enter its sizes and quantity. Plan dimensions are in metres; thicknesses and section sizes are in millimetres.
  2. For beams, enter the depth below the slab, and for columns, the height between slabs, so that the same concrete is not counted twice.
  3. For a staircase, enter the number of steps, the riser, the going, the waist thickness and the flight width. Add landings as slabs.
  4. Set your waste allowance and truck size. The default truck size is 10 m³; change it to suit your supplier's trucks. The volume to order is the ready-mix quantity, in m³ and yd³.
  5. If you are batching on site, leave the mix box ticked, choose an IS 456 nominal ratio or type your own, and read the cement bags, sand and aggregate. The dry-volume factor and cement density are conventional starting points and are editable.
  6. Read the volume to order, the truck count and the material split, then use Print, Download PDF or Download CSV to keep the take-off.

Assumptions and limitations

  • Volumes are geometric. No deduction is made for reinforcement, ducts, sleeves or openings, and no addition for drops, upstands or haunches unless you enter them as separate elements.
  • The waste allowance is a single percentage you choose; it is not a recommendation.
  • The staircase model is a straight flight with a constant riser and going. Winders, spiral and cranked stairs need their own take-off.
  • Self-weight uses the unit weight you enter, which defaults to 25 kN/m³ for reinforced normal weight concrete [1]. Lightweight and heavyweight concretes need their own values.
  • Truck counts are arithmetic only. Pump lines, washout and site conditions are not included.
  • The cement–sand–aggregate split is optional. It applies the mix ratio and a dry-volume factor (default 1.54) to the volume to order. The factor is a take-off convention, not a code requirement.
  • Nominal mix ratios for M20 and leaner grades follow IS 456:2000 Table 9. M25 and richer mixes are design mixes under that standard; enter your approved ratio.
  • Cement mass uses the bulk density you enter (default 1,440 kg/m³). Sand and aggregate are reported as dry loose volume, in m³ and ft³, not as tonnes, unless you convert them with your own supplier densities.

Cement, sand and aggregate

For 1 m³ of concrete to order, an M20 nominal mix of 1 : 1.5 : 3, a dry-volume factor of 1.54 and a cement density of 1,440 kg/m³, the dry volume is 1.54 m³. Cement is 1.54 × 1 / 5.5 = 0.280 m³, or 403.2 kg, which is 8.06 bags of 50 kg, so 9 bags to buy. Sand is 0.420 m³ (14.8 ft³) and aggregate is 0.840 m³ (29.7 ft³). Scale those figures by the volume to order, including your waste allowance.

Thinner slabs, less concrete

Slab concrete usually dominates a building frame. If you are comparing schemes, run the PT slab thickness calculator for a first depth, then the RC vs PT slab calculator to see the difference in concrete, rebar and cost per m². Our guide to post-tension vs RC slabs in the UAE explains where the savings come from. For reinforcement quantities, use the rebar weight calculator.

References

The codes and standards the calculator follows, consulted on 17 November 2026. Clause numbers are given so you can check each step; always use the edition and national annex adopted for your project.

  1. CEN: EN 1991-1-1:2002 Eurocode 1: Actions on structures, Part 1-1: Densities, self-weight, imposed loads for buildings, Annex A Table A.1 (normal weight concrete 24 kN/m³, plus 1 kN/m³ for normal reinforcement)
  2. ASTM International: ASTM C94/C94M Standard Specification for Ready-Mixed Concrete (ordering, measurement of quantity and delivery)
  3. Bureau of Indian Standards: IS 456:2000 Plain and Reinforced Concrete — Code of Practice, Table 9 (nominal mix proportions for M5 to M20). Clause 9 requires a design mix for M25 and richer grades.
  4. Worked example (this page): 1 m³ to order, M20 1 : 1.5 : 3, dry-volume factor 1.54, cement bulk density 1,440 kg/m³ → 403.2 kg of cement (9 bags of 50 kg), 0.420 m³ sand, 0.840 m³ aggregate. The 1.54 factor and 1,440 kg/m³ density are conventional take-off values and are editable.

Part of our free engineering tools and design guides. Codes are referred to by clause where we are confident of the reference; always check the edition and national annex adopted for your project.

S-561 FAQ

Questions we are asked about this.

How do I calculate the concrete volume of a slab?

Multiply the length by the width by the thickness, all in metres. A 10 m by 8 m slab that is 250 mm thick holds 10 × 8 × 0.25 = 20 m³. Add a waste allowance for the order quantity.

How do I calculate the volume of a circular column?

Use π × D²/4 × H. A 600 mm diameter column 3.5 m high is π × 0.6²/4 × 3.5 = 0.99 m³.

How is the staircase volume worked out?

Each step is a triangle of half the riser times the going, times the flight width. The waist slab under the steps is its inclined length, the number of steps times √(riser² + going²), times the waist thickness and the width. Landings are entered as slabs.

How many trucks of concrete do I need?

Divide the volume to order by the truck size and round up. With 33.1 m³ and 10 m³ trucks you need four loads, the last one carrying 3.1 m³. Truck sizes vary, so enter the size your supplier uses.

What waste allowance should I use?

There is no single figure. It depends on the element, the formwork, the pour method and how the quantity was measured. Use the allowance your team normally applies; enter 0 for the net volume.

How many cement bags do I need for 1 m³ of M20 concrete?

For a nominal 1 : 1.5 : 3 mix, a dry-volume factor of 1.54 and a cement density of 1,440 kg/m³, 9 bags of 50 kg (403.2 kg, which is 8.06 bags before rounding up). Sand is 0.420 m³ and aggregate is 0.840 m³. Scale by the volume to order, including waste. M20 is the richest nominal mix in IS 456:2000 Table 9; richer grades need a design mix.

How is the cement, sand and aggregate quantity worked out?

The volume to order (net volume plus your waste allowance) is multiplied by a dry-volume factor (default 1.54) to estimate the loose volume of the constituents. That dry volume is split in the mix ratio. Cement is converted to kilograms with the bulk density you enter, then to bags. Sand and aggregate stay as loose volume, in m³ and ft³. The factor and the density are conventions, not code values, and you can edit both.

Can I print or save the results?

Yes. Print gives a clean report with the inputs, results, working, date and disclaimer. Download PDF creates the same report as a PDF in your browser, and Download CSV gives the figures for a spreadsheet. Nothing is uploaded to our server.

S-901 Contact

Send the drawings. Get an answer from our engineers.

WhatsApp or email the architectural or structural set, the location and what you need. The reply comes from the engineers who will do the work, with a proposed scope and programme.

Office
Al Warqa 1, Dubai, UAE
Hours
Sunday – Thursday, 09:00 – 18:00 GST