1. Home
  2. Post tension companies in the UAE
Dubai  ·  All seven emirates  ·  GCC

Post tension design in the UAE

Iron Axis is a Dubai-based post-tension engineering team. We provide PT design review, optimisation, preliminary design support, full PT design packages, and site supervision and stressing support for consultants, main contractors, developers and PT specialist contractors across the UAE and the GCC.

Design codes
ACI 318 · Eurocode 2 · PTI
Experience
15+ years · UAE · KSA · Qatar · India
S-201 Who we are

Post-tension engineering for the UAE and the GCC.

If you are comparing post tension companies in the UAE, or looking for post tension UAE engineering, our work is the design: PT design review, optimisation, preliminary design support, a full PT design package, and site supervision and stressing support. We work with consultants, main contractors, developers and PT specialist contractors from the first slab thickness estimate through to the stressing records.

Our engineers bring 15+ years of post-tension design and site experience across the UAE, Saudi Arabia, Qatar and the wider GCC. The team is led by our Lead Engineer, Mohamed Shahid. PT slabs are analysed and designed in RAM Concept, with calculations clause-referenced to the governing code so a reviewer can follow them.

We work with consultants, main contractors, developers and PT specialist contractors across the UAE and the GCC. Our scope is PT design review, optimisation, preliminary design support, a full PT design package, and site supervision and stressing support.

Read more about our team.

S-203 How we work

Working with consultants, contractors and PT specialists.

Post-tensioned floors involve several parties, and we fit into the team in whichever role the project needs:

  • Structural consultants: we act as the PT design partner of the consultant of record, preparing the PT design, calculation report and drawings in the consultant's format, or carrying out a technical review of a PT design prepared by others.
  • Main contractors and developers: we review a PT scheme before it is priced or built, check value-engineering proposals, and provide site supervision so the tendons in the concrete match the design.
  • PT specialist contractors: we prepare designs and shop drawings to the contractor's approved system, including friction values, anchorage details and stressing data, and support the contractor through consultant and authority comments.

A typical job runs from brief and scheme through design, drawings and submission support to site inspections and stressing record review. To start, see what to send in our PT design brief checklist.

S-204 Authorities

Post-tension work across the UAE, emirate by emirate.

Every emirate has its own authority and its own way of receiving structural and post-tension submissions, and some master developers and free zones add their own requirements. The engineering principles stay the same, but the code edition, the calculation report format, the drawing requirements and how comments are raised do not. Our engineers have worked with these requirements across the UAE, so our designs and reviews are prepared to the criteria of the authority that will check them.

How the system is used also changes from one emirate to the next. In Dubai and Abu Dhabi, post-tensioned floors are common on high-rise towers, podiums and transfer levels, where long spans and tighter storey heights drive the framing. In Sharjah, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain, PT is often used on mid-rise residential and mixed-use buildings on a fixed plot, where a thinner slab and fewer columns increase usable floor area. Along the coast, durability, cover and the choice between bonded and unbonded post-tensioning matter as much as the span.

What goes into a PT submission varies with the authority, but a consultant will usually need a calculation report to the governing code, an analysis model, tendon layout and profile drawings, stressing data, and — where the authority asks for it — a response to a PT design review checklist. In Dubai, PT design is carried out by a Dubai Municipality licensed post-tension design engineer, and design is typically to the Dubai Building Code together with the authority's structural and PT submission requirements. Dubai Development Authority (DDA) and Trakhees publish their own structural and post-tension review procedures for the plots they regulate. In Abu Dhabi the structural design sits under the Abu Dhabi International Building Code (ADIBC), with ACI 318 for concrete. We confirm the authority, the code edition and the consultant's specification at kick-off, then prepare the report and drawings in the format that authority expects. The consultant of record makes the submission.

AuthorityWhat we provide
Dubai Municipality, and Dubai authorities such as DDA and TrakheesPT design to the Dubai Building Code and the authority's structural and PT submission requirements; technical review and comment responses through the consultant. See post tension design in Dubai.
Abu Dhabi (Abu Dhabi, Al Ain, Al Dhafra)PT design and review to the Abu Dhabi building code framework and consultant's specification. See post tension design in Abu Dhabi and Al Ain.
Sharjah MunicipalityPT calculations, drawings and review for Sharjah submissions, to the municipality's structural conditions for PT slabs. See post tension design in Sharjah.
Ajman MunicipalityPT design and technical review for Ajman permits, structural submissions and the structural audit before slab pours. See post tension design in Ajman.
Ras Al Khaimah MunicipalityPT design to the RAK structural regulations, which have their own pre-stressed concrete chapter. See post tension design in Ras Al Khaimah.
Umm Al Quwain MunicipalityPT design and review for residential, waterfront and industrial buildings. See post tension design in Umm Al Quwain.
Fujairah MunicipalityPT design with seismic and coastal durability checks for the east coast. See post tension design in Fujairah.

Post tension design by emirate: Dubai · Abu Dhabi and Al Ain · Sharjah · Ajman · Ras Al Khaimah · Umm Al Quwain · Fujairah

Technical review and submission support

We provide technical review of PT calculations, analysis models and drawings, and prepare responses to PT-related authority comments for the consultant of record, who makes the submission. Where an authority requires an approved third-party checker, stamp or appointment, the consultant and authority confirm the route, and our technical review supports it. See our municipality PT design review support.

S-205 Project types

The structures we design and check.

The project types below describe the kind of work our team does; we publish named project case studies only with client permission.

  • Residential, office and hotel towers: PT flat slabs and banded-beam floors for typical floors, where a thinner slab and fewer beams save height and programme.
  • Podiums and car parks: long-span podium and parking slabs with ramps, heavier loads and exposure to vehicle chlorides.
  • Transfer slabs and beams: PT transfers under column offsets, with high tendon forces and anchorage zones designed in detail. See PT transfer slab and beam design.
  • Villas and low-rise buildings: PT slabs used to reduce thickness and cracking.
  • Existing buildings: strengthening design for new openings, load changes and repairs in existing slabs, including PT slabs.

For background on system choice, read our guides on bonded vs unbonded post-tensioning and PT flat slab vs banded beam.

S-206 Choosing

What to look for when comparing post tension companies in the UAE.

When you are comparing post tension companies in the UAE for design, review or site supervision, ask the following.

  • A licensed PT design engineer: in Dubai, PT design is carried out by a Dubai Municipality licensed post-tension design engineer. Ask who will sign the design and which licence they hold.
  • Traceable calculations: a report a reviewer can follow, clause-referenced to the governing code, with the analysis model available.
  • System-aware detailing: drawings that match the PT specialist contractor's approved system, anchorage data and stressing method.
  • Site and stressing support: the same engineers who design or review the work can attend for pre-pour checks and stressing records.
  • Site follow-through: the same engineers available for RFIs, pre-pour inspections and elongation records.
S-207 GCC

Beyond the UAE: remote support across the GCC.

Design work is delivered remotely from Dubai, with planned site visits where agreed. In Saudi Arabia we work with the locally registered engineering office that submits the design.

S-208 FAQ

Questions we are asked about this.

What work do you do on post tension UAE projects?

We provide PT design review, optimisation, preliminary design support, a full PT design package, shop drawings, and site supervision and stressing support. We work with consultants, main contractors, developers and PT specialist contractors across the UAE and the GCC.

Which emirates do you cover?

We support projects in Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain. Site attendance in the UAE is agreed as part of the scope.

Can you submit our PT design to the municipality?

Submissions are made through the consultant of record. We prepare the PT calculations, drawings and technical responses to authority comments, and support the consultant through the review. Approval is decided by the authority.

How do you support authority third-party PT checks?

We provide technical PT design review. Where an authority requires a formally approved third-party checker or a particular stamp, the consultant and authority confirm the eligible reviewer, and our review supports that process.

Who do you work for?

Structural consultants, main contractors, developers and PT specialist contractors. We can work as the PT design partner of the consultant of record or support a PT specialist contractor with design, drawings and stressing data.

Which software do you use?

PT slabs are analysed and designed in RAM Concept, with production in AutoCAD and Revit. Models are handed over with the design package where agreed.

Do you work outside the UAE?

Yes. We support projects in Saudi Arabia, Qatar, Oman, Bahrain and Kuwait, delivered remotely from Dubai with planned site visits where agreed.

What should I look for when comparing post tension companies in the UAE?

Ask who will sign the PT design and which licence they hold, whether calculations are clause-referenced to the governing code, whether drawings match the appointed PT specialist contractor's system, and whether the same engineers will follow the work on site. Our scope covers PT design review, optimisation, preliminary design support, a full PT design package, and site supervision and stressing support.

Do you handle post tension UAE projects in every emirate?

Yes. We support post-tension design, review and site supervision in Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain. Site attendance in the UAE is agreed as part of the scope.

S-901 Contact

Send the drawings. Get an answer from our engineers.

WhatsApp or email the architectural or structural set, the location and what you need. The reply comes from the engineers who will do the work, with a proposed scope and programme.

Office
Al Warqa 1, Dubai, UAE
Hours
Sunday – Thursday, 09:00 – 18:00 GST