  2. Full PT design package
Service 04  ·  ACI 318-19 · PTI

Full post-tension design package

Complete post-tension slab design from scheme to stressing data: analysis, calculation report, tendon layouts, profiles and stressing schedules, prepared for authority submission and for any PT specialist contractor to build. Analysis and design in RAM Concept.

Licence 01
DM Unlimited Design
Licence 02
DM Post-Tension Design
Experience
15 years · UAE · KSA · Qatar · India
S-201 Scope

What a PT slab design from us covers.

One engineer runs the scheme, model, checks and drawings, so the thickness quoted at scheme stage is the one that reaches the authority.

01 / SCHEME

Scheme & thickness

Span-to-depth, PT against RC flat slab, banded/distributed or two-way banded layout, and a target precompression in the working range of roughly 1.0–2.0 MPa, all settled before a tendon is drawn.

Span/depthP/A
02 / ANALYSIS

Model & code checks

RAM Concept models with load balancing, hyperstatic (secondary) actions, transfer and service stress checks, and long-term deflection allowing for creep and shrinkage.

ACI 318-19 Ch. 8§24.5
03 / SHEAR

Punching & integrity

Two-way shear at every column, stud-rail or stirrup schedules, minimum bonded reinforcement over columns, and the structural-integrity tendons that must pass through the column cores.

§22.6Stud rails
04 / ISSUE

Drawings & submission

Tendon layout and profile drawings, chair schedule, stressing schedule with theoretical elongations, a clause-referenced calculation report and point-by-point replies to review comments.

DWG + PDFCalc report
S-301 Method

The drape is the design.

The thickness, the programme and most of the cost are fixed by the tendon profile, so that is where the effort goes first.

DRAPE 165 SPAN 8.0 m 250 LOW POINT AT 0.5L A — ELEVATION B — PLAN BANDED — OVER COLUMN LINES DISTRIBUTED A A
Fig. 3.1 — Banded / distributed layout. Continuous unbonded tendon, reverse curvature over supports.

A PT slab is checked twice: at transfer, when the concrete is young and almost nothing holds the slab down, and in service under full load. Both cover flexure, punching, deflection and crack control, and the hyperstatic effects of the prestress are carried into the ultimate design.

We usually balance 60–80% of the dead load. More, and the slab hogs. Less, and you pay for PT that behaves like RC. The usable drape is what remains after cover, sheathing and crossing bars, checked against chair heights the contractor can buy.

Unbonded or bonded?

Unbonded monostrand dominates Middle East building slabs and is our default. Bonded multistrand suits heavily loaded transfer beams or wherever it is specified. The two differ in ultimate tendon stress, corrosion protection and how future openings are cut, so we agree the system before design starts.

S-302 Codes

Designed to the code your consultant specifies.

Dubai accepts American, European or British design codes. We work in whichever one the project’s lead consultant has adopted, and we keep to it throughout.

  • ACI 318-19 + PTI DC80Two-way slabs (Ch. 8), transfer and service stresses (§24.5), two-way shear (§22.6). The usual basis in the UAE and KSA.
  • EN 1992-1-1 + TR43Eurocode 2 with Concrete Society TR43, where the consultant works to European practice.
  • BS 8110Still specified on some legacy and consultant-standard projects.
  • SBC 304 · QCS 2024Saudi concrete code in KSA. Qatar Construction Specifications, Section 5 Part 18, for prestressing in Qatar.

More on regional work: post-tension design in Saudi Arabia and post-tension design in Qatar.

S-303 Dubai requirements

Dubai rules we design to from day one.

Dubai Municipality’s building regulations add PT-specific requirements on top of the design codes. These are the ones that most often change a scheme if they are found late.

  • Thickness200 mm minimum, unless a thinner slab is approved first.
  • Materials1860 MPa DCL-certified strand. Concrete 35 N/mm² cube at 28 days, 25 N/mm² at transfer.
  • Live loadAt least 3 kN/m², or code values with pattern loading and ceiling services included.
  • DeflectionLong-term multipliers 3.0 (dead), 3.0 (prestress after losses), 1.5 (live), on the cracked section.
  • RestraintAbove 3 MPa average precompression, shortening against supports must be assessed.
  • DetailingA two-strand duct through each column, T10 at 300 mm bottom mesh, edge U-bars, punching steel at all columns.
  • StressingJacking at no more than 80% of breaking load. Elongations on a separate sheet, site results within ±10%.

Summarised from Dubai Municipality Administrative Resolution No. 37 of 2021 (Article 54, prestressed concrete). A summary, not the regulation. We check the current authority checklist (DM, DDA, Trakhees or other) on every job.

S-501 Your brief

What to send for a fee proposal.

With these we can come back with a framing option, an indicative slab thickness and a fixed fee. You can also size the slab yourself first with the scheme-stage estimator.

  • Architectural plans and sections (DWG preferred), with the structural grid if one exists
  • Finishes, partitions, façade and MEP loads, plus any plant or heavy areas
  • Fire rating and exposure class, or the consultant’s specification
  • The approving authority, and the design code the lead consultant has adopted
  • The PT system or specialist contractor, if one is already appointed
  • Programme: pour sequence, cycle time and the issue dates you need

Structural design already done? See PT shop drawings. Weighing PT against RC? See PT design optimisation. Scheme designed by someone else? A technical peer review is usually faster than a redesign.

S-134 Authorities

Authority approvals and PT criteria across the UAE.

Familiar with and well versed in each municipality's PT design and submission criteria.

Every emirate, and some master developers and free zones, has its own authority with its own way of receiving structural and post-tension submissions. The engineering principles do not change, but the code edition, the format of the calculation report, the drawing requirements and how comments are raised do. Our engineers have worked with these requirements over 15+ years in the UAE and the wider GCC, so a PT design or review from Iron Axis is prepared to the criteria of the authority that will check it.

AuthorityWhere it applies and what it means for PT
Dubai Municipality (DM)Most plots in Dubai. Structural design to the Dubai Building Code with DM structural and PT submission requirements; PT design by a DM-licensed post-tension design engineer.
Dubai Development Authority (DDA)Plots in DDA-regulated communities and free zones. DDA publishes its own structural and post-tension design review checklists for consultant submissions.
Trakhees (PCFC)Plots regulated by the Ports, Customs and Free Zone Corporation, such as Jebel Ali areas. Trakhees has its own building and structural submission procedures.
Abu Dhabi (DMT and municipalities)Abu Dhabi, Al Ain and Al Dhafra. Structural design under the Abu Dhabi International Building Code (ADIBC), which is based on the International Building Code, with ACI 318 for concrete.
Sharjah MunicipalitySharjah city and its regions, with the municipality's own structural drawing and calculation submission requirements.
Ajman MunicipalityAjman. Municipality building permit and structural submission requirements.
Ras Al Khaimah, Umm Al Quwain and FujairahEach municipality, and the relevant free zone authority where the plot falls in one, sets its own permit and structural submission requirements.

At kick-off we confirm which authority has jurisdiction over the plot, the governing code and edition, and the consultant's specification. The calculation report, tendon drawings and comment responses are then prepared in the format that authority expects. Submissions themselves are made through the consultant of record.

S-153 FAQ

Questions we are asked about this.

What slab types do you design with post-tensioning?

Flat slabs, banded-beam floors, podium and car park slabs, transfer slabs and beams, and ground-bearing PT slabs, with unbonded or bonded systems.

Which software do you use?

RAM Concept for PT slab analysis and design, with in-house tools for drawing production. The RAM Concept model is handed over with the package.

Do you design for any PT system?

Yes. The design is contractor-neutral and uses the friction and anchorage data of the PT system approved for the project.

What do you need to start?

Architectural plans and sections, loading and finishes, the authority, the fire rating and exposure, and the programme.

S-901 Contact

Send the drawings. Get an answer from our engineers.

WhatsApp or email the architectural or structural set, the location and what you need. The reply comes from the engineers who will do the work, with a proposed scope and programme.