1. Home
  2. Post tension Saudi Arabia
  3. Madinah
Madinah  ·  Western Region

Post tension design in Madinah

PT design review, optimisation, preliminary design support, full PT design packages, and stressing support for hotels, residential buildings, podiums and car parks in Madinah, designed to SBC 304 and SBC 301 for the accredited engineering office of record.

Design codes
ACI 318 · Eurocode 2 · PTI
Experience
15 years · UAE · KSA · Qatar · India
S-811 Madinah

PT slabs in Madinah.

Madinah's construction is led by hotels and serviced residences for visitors, alongside residential districts, schools, hospitals and car parks as the city grows. As in Makkah, hotel buildings bring transfer floors where room grids meet open podiums, long-span public floors, and repetitive typical floors where a thinner slab pays back over many storeys. Away from the centre, mid-rise residential and mixed-use buildings use PT flat slabs for fewer columns and a flat soffit.

Ground and seismic setting

Madinah sits beside Harrat Rahat, a large volcanic field of basalt lava flows south-east of the city. The volcanic and seismic hazard of the area has been studied in detail, including in a USGS-led probabilistic seismic hazard analysis for the western Kingdom that addressed the Harrat Rahat volcanic field specifically. For PT design that means two things: the site's seismic parameters and design category under SBC 301 are confirmed before the floor system is chosen, and ground conditions, which can range from soils to basalt, are taken from the geotechnical report for rafts, ground-bearing slabs and basement restraint.

S-812 Authorities

Balady and the Madinah Region Municipality.

Building permits are issued by the Madinah Region Municipality through Balady, with the application prepared and submitted by an accredited engineering office; the municipality publishes a directory and rating of the engineering offices accredited with it. Large developments can carry additional planning and design requirements, which we confirm at kick-off.

On the Balady platform, the owner authorises a design engineering office, which prepares the architectural and structural designs and submits the application. For permits on Balady, the design is then audited for Saudi Building Code compliance by a technical inspection company assigned through the latent defects insurer before it reaches the municipality, and a supervising engineering office and contractor are appointed before the permit is issued. We prepare the PT design, calculation report and tendon drawings for the engineering office that holds the appointment, and we answer the inspector's and the municipality's structural comments through that office.

Saudi Building Code basis

  • SBC 304 (concrete structures) for the PT design. It was developed from the ACI 318 family with Saudi modifications, so the slab is designed with ACI-style provisions on a Saudi load and durability basis.
  • SBC 301 for loads, including wind and earthquake, and the seismic design category of the site.
  • SBC 303 (soils and foundations) where PT rafts or ground-bearing slabs are involved.
  • PTI guidance for tendon detailing, stressing and records.

The Saudi Building Code is issued in editions (the current one is the 2024 edition), so we confirm the edition in force at kick-off, together with the consultant's specification and the requirements of the engineering office that holds the appointment.

S-813 Services

What we do on Madinah projects.

Our post-tension services in Madinah

  • PT design review: a check of the PT scheme against SBC 304 and SBC 301, including the seismic drift check at slab-column connections where the category requires it.
  • PT design optimisation: slab thickness and prestress on repetitive hotel and residential floors, once the seismic category is fixed.
  • Preliminary design support: slab system, depths and transfer options at concept stage, with the seismic category established first.
  • Full PT design package: calculation report, tendon layouts, profiles and stressing schedules for the accredited engineering office's review and stamp.
  • Site supervision: pre-pour inspection support and RFI answers, with site attendance arranged in the scope.
  • Stressing support: stressing sequence, calculated elongations and record review.

Technical focus in Madinah

Transfer floors are covered on PT transfer slabs and beams; deflection and vibration on long-span public floors in long-term deflection, Eurocode vs ACI and floor vibration in PT slabs; and modelling habits for the analysis in RAM Concept tips for PT slab design.

S-814 How we work

Remote design, from Dubai.

Design is delivered remotely from our Dubai office, as the PT design partner to an accredited Saudi engineering office, consultant of record or PT specialist contractor. Site attendance is arranged in the scope.

Who does the work: our engineering team brings 15+ years of post-tension design and site experience across the GCC and is led by our Lead Engineer, Mohamed Shahid. PT slabs are analysed and designed in RAM Concept, with calculations referenced clause by clause to the governing code.

S-818 FAQ

Questions about post tension design in Madinah.

Who issues building permits in Madinah?

The Madinah Region Municipality, through Balady, with the application prepared and submitted by an accredited engineering office.

Does seismic design matter in Madinah?

Yes. Madinah is beside the Harrat Rahat volcanic field, whose hazard has been studied in detail, so we confirm the site's seismic parameters and design category under SBC 301 before choosing the floor system.

Which code do you use in Madinah?

SBC 304 for concrete and SBC 301 for loads, with SBC 303 for rafts and PTI guidance for detailing; the edition is confirmed at kick-off.

Can you design PT transfer floors for Madinah hotels?

Yes. We design and review PT transfer slabs and beams, including staged stressing and the effect of shortening on supporting columns and walls.

Do you work on Madinah projects remotely?

Yes. Design and review are delivered from Dubai; site attendance is arranged in the scope.

Can you review a PT design before it goes to the technical inspector?

Yes. A PT design review checks the model, calculations and drawings against SBC 304 and SBC 301 so the engineering office can resolve issues before submission.

S-901 Contact

Send the drawings. Get an answer from our engineers.

WhatsApp or email the architectural or structural set, the location and what you need. The reply comes from the engineers who will do the work, with a proposed scope and programme.

Office
Al Warqa 1, Dubai, UAE
Hours
Sunday – Thursday, 09:00 – 18:00 GST