Punching Shear in PT Slabs: What Prestress Adds
What prestress contributes to punching shear capacity in a PT slab, and what still has to be checked at the columns.

Check two-way (punching) shear at interior, edge and corner columns of reinforced and post-tensioned flat slabs. We run ACI 318-19 22.6 and EN 1992-1-1 6.4 side by side, with every step shown, the minimum effective depth that passes, and a printable report, a PDF and a CSV.
Indicative only, not a design. The results follow the methods and clauses set out below and depend on your inputs. Check them against the project drawings, specifications and the code edition and national annex adopted for the project.
What prestress contributes to punching shear capacity in a PT slab, and what still has to be checked at the columns.
Punching shear is often the check that sets the thickness of a flat slab, and it is a brittle failure, so it gets close attention in every RC and PT flat slab we design or review. This calculator works through the two codes we use most, ACI 318-19 [1] and EN 1992-1-1 [2], for the same column, so you can see the control perimeter, the stresses, the resistance and the utilisation of each, and the minimum effective depth that passes without shear reinforcement.
With light top steel the Eurocode check is often the more demanding of the two, as the default inputs show. Run both when a project allows either code.
Sizing a slab first? Try the PT slab thickness calculator or the RC vs PT slab calculator. For the bars in the slab, use the ACI 318 development length or Eurocode 2 lap length calculators.
The codes the calculator follows, consulted on 16 November 2026. Clause numbers are given so you can check each step; always use the edition and national annex adopted for your project.
Part of our free engineering tools and design guides. Codes are referred to by clause where we are confident of the reference; always check the edition and national annex adopted for your project.
Find the control perimeter around the column (d/2 from the face in ACI 318, 2d in Eurocode 2), divide the factored column reaction by the perimeter times the effective depth to get the shear stress, and compare it with the code resistance of the concrete. If it fails, increase the depth, the column size or the top steel, add a drop panel, or provide shear reinforcement.
For a non-prestressed slab, vc is the least of 0.33 λs λ √fc′, 0.17 (1 + 2/β) λs λ √fc′ and 0.083 (2 + αs d/b0) λs λ √fc′ in MPa, multiplied by φ = 0.75. For a 500 mm square interior column, d = 200 mm and fc′ = 40 MPa, φvc is about 1.57 MPa.
vRd,c = CRd,c k (100 ρl fck)^(1/3) + k1 σcp, not less than vmin + k1 σcp, with recommended CRd,c = 0.18/γc = 0.12, k = 1 + √(200/d) ≤ 2 and k1 = 0.1. It is checked on the basic control perimeter u1 at 2d from the column.
Where the structure does not rely on frame action for lateral stability and adjacent spans differ by no more than 25%, EN 1992-1-1 6.4.3(6) allows β = 1.15 for interior, 1.4 for edge and 1.5 for corner columns. Otherwise calculate β from the moments using 6.4.3(3) to (5).
Yes. In ACI 318-19 interior columns of PT slabs use vc = 0.29 λ √fc′ + 0.3 fpc + Vp/(b0 d) (or the αs equation if lower), within the limits of 22.6.5.5. In Eurocode 2 the precompression adds 0.1 σcp to vRd,c. Tendons banded over the columns also carry part of the load through their vertical component.
Yes. Print gives a clean report with the inputs, results, working, date and disclaimer. Download PDF creates the same report as a PDF in your browser, and Download CSV gives the figures for a spreadsheet. Nothing is uploaded to our server.